MovieTech Platform 400-P3

With only two different bracing and parallelogram bars as well as corresponding crane-arm segments with a length of 1 m and 1.5 m, the MT crane system is the compelling choice due to its extremely short set-up times. Thanks to its intelligent connection system, the "push pins" which were forever being lost at the filming location are now a thing of the past.
The MT 400 is entitled to bear the BG-PRÜFZERT badge.

Rear boom 1 m 1, 5m
Required boom, front 3 x 1,5 m 3 x 1,5 m
Strut bars / parallelogram bars Front 9 x 1,5 m 9 x 1,5 m
Rear 3 x 1 m 3 x 1,5 m
Total travel 8,63 m 8,63 m
Maximum height Without column extension 5,92 m 4,89 m
With column extension 6,25 m 5,95 m
Counterweight without payload 132 kg 80 kg
Payload 135 kg 180 kg
Counterweight with payload 616 kg 560 kg
Boom length Front (reception flange) 5,8 m 5,8 m
Rear (outer edge of basket) 1,97 m 2,45 m
Own weight without payload and counterweights 299,2 kg 325,7 kg

Please complete the form below and we'll get back to you as soon as possible.